claude

work-breakdown-structure

WBS from scope + deliverables. Enforces 100% rule, mutually exclusive siblings, deliverable-oriented nodes, 8/80-hour sizing, depth-by-need (3–5 levels). Decomposition axes (deliverable / phase / responsibility / hybrid) consistent within branches. WBS dictionary per node (description, deliverable, acceptance, size, deps, risks). Milestones distinct from work. Intra-WBS dependencies + coverage matrix. Anti-patterns flagged.

2 on GitHubby Sven Siertsemav1.0.0MITupdated 5 months agoplanning
/

Plugin work-breakdown-structure from marketplace svens-claude-plugins in SSiertsema/claude-code-plugins. Commands read from the repo's manifest — 1 month ago.

What it installs

Skills (1)

  • work-breakdown-structure

    Produce a WBS — hierarchical deliverable-oriented decomposition (100% rule, 8/80 sizing), WBS dictionary entries, milestones, intra-WBS dependencies, numbering. Not a schedule.

View source on GitHub

More from SSiertsema/claude-code-plugins

All 183 plugins →

Frame A/B tests with falsifiable hypothesis, variants, pre-committed primary/secondary/guardrail metrics, MDE, sample size (formula shown), duration spanning a weekly cycle, peek policy, pre-committed decision rule, validity risks with mitigations, and ethics review. Mermaid diagrams with optional PNG export.

1 skill

2

Write, audit, or split acceptance criteria for a user story. Given/When/Then (Gherkin) default + rule-based + mixed formats. Systematic coverage (happy path + negative + edge + boundary + a11y + optional performance/security/data/integration). INVEST at story + AC level. SPIDR split (Spike / Path / Interface / Data / Rule) when story too big. Scenario outlines for parametric data. Mermaid coverage pie + split diagrams with optional PNG export.

1 skill

2

Define accessibility requirements against WCAG 2.2 AA (default), AAA, EN 301 549, EAA, Section 508, ADA. Produces per-feature Given/When/Then criteria, assistive-technology support matrix per platform, combined automated + manual + AT + user-testing plan, and remediation priority for existing products. Not a conformance audit. Mermaid diagrams with optional PNG export.

1 skill

2

Write, review, supersede, or index Architecture Decision Records. Michael Nygard format (default) + Y-statement alternative. Immutable once accepted — supersession chain preserves old ADRs. Status lifecycle (Proposed / Accepted / Deprecated / Superseded). ADR log with chronological index + supersession chains visible. Review mode flags stale ADRs + missing consequences. Integrates with traceability-matrix. Mermaid timeline with optional PNG export.

1 skill

2

Bottom-up thematic clustering of unstructured items (research notes, interview quotes, brainstorm ideas, feedback) using the KJ method. Discovers emergent themes with evidence traceability, identifies patterns/tensions/gaps, flags outliers, and prioritizes clusters by signal strength. Mermaid diagrams with optional PNG export.

1 skill

2

Algorithm design pre-implementation: problem + inputs/outputs + constraints, ≥2 candidate approaches compared on time+space+stability+in-place+parallelism, chosen approach with loop/data/global invariants, language-neutral pseudocode, correctness argument (invariant / induction / preservation / reduction), edge-case catalog, worst/avg/space complexity, numerical + concurrency concerns, property-based + boundary + performance + fuzz tests, parallelization + out-of-core + streaming variants.

1 skill

2

Similar plugins

agent-skills

claudecodex

Production-grade engineering skills covering every phase of software development: spec, plan, build, verify, review, and ship.

25 skills · 4 agents

addyosmani/agent-skills 116,782

Tenant-isolated AI teams that plan work, coordinate tasks, recall approved context, and return evidence-backed results

6 skills · 6 commands · 4 agents · 1 MCP server

ruvnet/ruflo 81,589

marketing-skills

claudecodex

53 marketing skills for technical marketers and founders: CRO, copywriting, cold email, prospecting, SEO, AI SEO, paid ads, SMS, ad creative, video production, image generation, co-marketing, churn prevention, pricing, referrals, revenue operations, sales enablement, customer research, site architecture, comprehensive AARRR-structured marketing plans, public relations and earned media, offer design, event marketing and webinars, and more

53 skills

coreyhaines31/marketingskills 59,996

aws-core

claudecodex

Build, deploy, and operate applications on AWS. Skills to author infrastructure-as-code, use core services, and complete common tasks.

27 skills · 1 MCP server

anthropics/claude-plugins-official 47,076

conductor

claudecodex

Context-Driven Development plugin that transforms Claude Code into a project management tool with structured workflow: Context → Spec & Plan → Implement

3 skills · 6 commands · 1 agent

wshobson/agents 42,461

Zoom

claude

Plan, build, and debug Zoom integrations across REST APIs, Meeting SDK, Video SDK, webhooks, bots, and MCP workflows. Search meetings, retrieve recordings, access transcripts, and design AI-powered Zoom experiences.

44 skills · 3 MCP servers

anthropics/knowledge-work-plugins 35,601

Maintain work-breakdown-structure?

This page updates itself from your repo. Add the badge to your README, or get it Featured to pin it above the organic results with a followed link to your site.

claude & codex plugins183 plugins