Annual STP Phase 2 finalisation check for Australian clients — verify YTD wages, PAYG-W and super are accurate per employee before the 14 July ATO deadline.
1 on GitHubby XBert IntelligenceMITupdated 1 month ago
Not in a marketplace yet, so it loads for one session with --plugin-dir.
Annual STP Phase 2 finalisation review for Australian clients — verify every employee's YTD payroll figures, income type, allowance disaggregation, RFB and termination payments before the 14 July FINAL event. Use when the user asks to run STP finalisation, finalise payroll for the year, check STP Ph
Slash commands (1)
/xbert-stp-finalisation:stp-finalisation
Run the annual STP Phase 2 finalisation check for an Australian client — verify every employee's YTD figures are accurate before the 14 July ATO deadline. Produces a Word working paper.
Shared rendering skills that turn a structured XBert plugin payload into a Word, Excel or PDF working paper saved to your project folder. Install it alongside the XBert review plugins — they hand their findings to it.
Surface every anomaly XBert that fired across the period as a flat ranked list with per-firing verification and recommended action. Checks the Anomaly Review agent is configured with linked XBerts before reviewing. No invented pattern labels, no user attribution, no Journal data.
Australian Federal Overlay — 10 commands for ASD Essential Eight, ISM, DTA DSS, Privacy Act 1988, OAIC NDB, PSPF, AI Assurance, DISP attestation, OT security, and SOCI/CIRMP
Expert guidance for FedRAMP certification and compliance under CR26 (FedRAMP Consolidated Rules for 2026). Use this skill whenever a user asks about FedRAMP authorization, ATO (Authority to Operate), cloud security for federal government, NIST SP 800-53 controls, CSP compliance, or any of the core FedRAMP document types: SSP, SAP, SAR, POA&M, CIS/CRM workbooks. Also trigger for questions about FedRAMP Certification Classes (A, B, C, D — new baseline labels: A = pilot/transitional, B = LI-SaaS/Low, C = Moderate, D = High, per NTC-0004), FedRAMP 20x (now the primary authorization pathway), OSCAL mandate (September 2026), 3PAO assessments, continuous monitoring (ConMon), gap assessments, system boundary definition, or architecture reviews for federal cloud. FedRAMP Ready retires July 28, 2026. When in doubt, use this skill — it covers the full FedRAMP lifecycle from readiness through continuous monitoring.
Design electronics with atopile's declarative DSL (ato). Provides language reference, package creation guides, and electronics design workflows.
8 skills
mawildoer/atopile-agent-skill 11
Maintain xbert-stp-finalisation?
This page updates itself from your repo. Add the badge to your README, or get it Featured to pin it above the organic results with a followed link to your site.