code-question-source-gateAnswer a building, electrical or plumbing code question only from code text the user pastes, after asking for the jurisdiction, adopted code, edition and local amendments, quoting section numbers only as they appear in the pasted text, separating what the text says from interpretation, and listing w
construction-defect-list-routingSplit an inspection report or a homeowner warranty narrative into one defect item per finding, each with location and symptom, route each item to a trade, flag items whose trade or location is unclear, and reconcile the item count against the source findings. Use when someone pastes inspection findi
rfi-draft-and-logTurn a field note into requests for information (RFIs) with one question per RFI, drawing, sheet and spec references only as given, the observed conflict kept apart from a proposed answer, schedule and cost impact asked for rather than assumed, and each RFI added to the project's RFI log with number
takeoff-quantity-unit-checkCheck a quantity takeoff or estimate sheet by writing each line's unit chain and recomputing it in code, confirming the waste factor is stated and applied once, making every total equal the sum of its lines, flagging lines far out of scale with sibling lines, and reporting each changed line with old