claude

risk-register

Persistent risk register. Stable IDs, inherent + residual scoring, controls, response strategy, review cadence, history, and multiple views (top risks, by owner, by category, overdue, recently changed). Ingests from risk-matrix, fmea, monte-carlo-simulation, pre-mortem. Markdown + CSV export. Mermaid diagrams with optional PNG export.

2 on GitHubby Sven Siertsemav1.0.0MITupdated 5 months agostrategy
/

Plugin risk-register from marketplace svens-claude-plugins in SSiertsema/claude-code-plugins. Commands read from the repo's manifest — 1 month ago.

What it installs

Skills (1)

  • risk-register

    Create and maintain a persistent risk register. Each risk has ID, statement, category, owner, likelihood, impact, score/level, response, current controls, residual risk, review cadence, status, and history. Supports ingesting risks from risk-matrix, fmea, monte-carlo-simulation, and pre-mortem. Expo

View source on GitHub

More from SSiertsema/claude-code-plugins

All 183 plugins →

Frame A/B tests with falsifiable hypothesis, variants, pre-committed primary/secondary/guardrail metrics, MDE, sample size (formula shown), duration spanning a weekly cycle, peek policy, pre-committed decision rule, validity risks with mitigations, and ethics review. Mermaid diagrams with optional PNG export.

1 skill

2

Write, audit, or split acceptance criteria for a user story. Given/When/Then (Gherkin) default + rule-based + mixed formats. Systematic coverage (happy path + negative + edge + boundary + a11y + optional performance/security/data/integration). INVEST at story + AC level. SPIDR split (Spike / Path / Interface / Data / Rule) when story too big. Scenario outlines for parametric data. Mermaid coverage pie + split diagrams with optional PNG export.

1 skill

2

Define accessibility requirements against WCAG 2.2 AA (default), AAA, EN 301 549, EAA, Section 508, ADA. Produces per-feature Given/When/Then criteria, assistive-technology support matrix per platform, combined automated + manual + AT + user-testing plan, and remediation priority for existing products. Not a conformance audit. Mermaid diagrams with optional PNG export.

1 skill

2

Write, review, supersede, or index Architecture Decision Records. Michael Nygard format (default) + Y-statement alternative. Immutable once accepted — supersession chain preserves old ADRs. Status lifecycle (Proposed / Accepted / Deprecated / Superseded). ADR log with chronological index + supersession chains visible. Review mode flags stale ADRs + missing consequences. Integrates with traceability-matrix. Mermaid timeline with optional PNG export.

1 skill

2

Bottom-up thematic clustering of unstructured items (research notes, interview quotes, brainstorm ideas, feedback) using the KJ method. Discovers emergent themes with evidence traceability, identifies patterns/tensions/gaps, flags outliers, and prioritizes clusters by signal strength. Mermaid diagrams with optional PNG export.

1 skill

2

Algorithm design pre-implementation: problem + inputs/outputs + constraints, ≥2 candidate approaches compared on time+space+stability+in-place+parallelism, chosen approach with loop/data/global invariants, language-neutral pseudocode, correctness argument (invariant / induction / preservation / reduction), edge-case catalog, worst/avg/space complexity, numerical + concurrency concerns, property-based + boundary + performance + fuzz tests, parallelization + out-of-core + streaming variants.

1 skill

2

Similar plugins

Neural trading strategies — self-learning LSTM/Transformer/N-BEATS models with Rust/NAPI backtesting

9 skills · 1 command · 4 agents

ruvnet/ruflo 81,589

Database migration automation, observability, and cross-database migration strategies

2 commands · 2 agents

wshobson/agents 42,461

Free AI-powered SEO toolkit — audit websites, plan content strategy, optimize pages, generate schema markup, cluster keywords, and track AI visibility. Works with any website or codebase.

11 skills · 6 commands

anthropics/knowledge-work-plugins 35,601

33 C-level advisory skills (install the separate companion c-level-agents plugin for the persona layer): virtual board of directors (CEO, CTO, COO, CPO, CMO, CFO, CRO, CISO, CHRO) plus General Counsel, CDO, CAIO, CCO, and VP of Engineering (DORA delivery throughput analyzer, engineering hiring funnel calculator with conversion + pipeline gap, eng team structure designer with squad/tribe + manager-trigger), executive mentor, founder coach, orchestration (Chief of Staff, board meetings, decision logger), strategic capabilities (board deck builder, scenario war room, competitive intel, M&A playbook), culture frameworks. The 13 cs-* persona agents + 21 /c-level-agents:* slash commands (founder-mode router, office-hours intake, multi-role boardroom, strategic sprint pipeline, cross-model consensus, cooldown freeze) ship in the companion c-level-agents plugin.

34 skills · hooks

alirezarezvani/claude-skills 29,725

Product strategy skills for PMs: vision, strategy canvas, value propositions, lean canvas, business model canvas, SWOT, PESTLE, Ansoff Matrix, Porter's Five Forces, and monetization.

12 skills · 5 commands

phuryn/pm-skills 27,939

Research, search, and analysis specialists - market research, competitive analysis, trend forecasting, and idea validation

VoltAgent/awesome-claude-code-subagents 26,513

Maintain risk-register?

This page updates itself from your repo. Add the badge to your README, or get it Featured to pin it above the organic results with a followed link to your site.

claude & codex plugins183 plugins